Pennsylvania Moves to Annual Category 1 Testing

What Building Owners Should Know

Pennsylvania’s Department of Labor and Industry has adopted ASME A17.1-2016, and its new lifting device regulation takes effect December 20, 2026.

Two changes stand out.

Category 1 testing becomes annual. Cat 1 is a no-load test or pressure test of an elevator’s life-safety systems (door interlocks, electrical safety switches, emergency communications, backup power and fire-service recall), witnessed by a certified third-party inspector. Covered elevators, escalators, platform lifts and wheelchair lifts must be tested at least every 12 months, with compliance required by December 20, 2027.

The test is no longer elevator-only. Where a unit has firefighters’ emergency operation or emergency power, the building’s fire alarm must be activated and the emergency power and transfer switch must be tested while the inspector is present. Allied recommends having your service provider(s) onsite during the test, for a faster response and resolution to any issues that may arise during the test.

The new test means getting the inspector, your fire alarm and generator providers, and our team to your building at the same time. As soon as the inspector confirms a date and time, we’ll let you know so you have as much time as possible to plan.
Passing the test now depends on your elevator contractor, your other service providers and the inspector working together. Planning ahead can avoid failed tests, retest fees and downtime. If you are interested in running through a pre-test, please contact us at [email protected].

Periodic tests are still required – Cat 3 for hydraulics and escalators, and Cat 5 for traction elevators. These tests may be conducted simultaneously with the annual test, but the annual testing must be completed and filed on time, by Dec. 20, 2027.

On The Inspector’s Radar

Fire Service Panel Upgrades, Maintenance Control Programs

Fire Service Panel Upgrades. If you are planning to upgrade your fire service panel, or you recently completed an upgrade, the State of Pennsylvania requires your elevator service company to pull a permit and perform an inspection with a state inspector present. Please notify Allied Elevator regarding any changes – planned or completed — to your fire service panel. 

Maintenance Control Program. There is renewed enforcement on having a Maintenance Control Program (MCP) stored in the machine room for each elevator. What is an MCP? It is the original equipment manufacturing documentation issued to the building Owner, either at new installation or modernization, for the specific equipment installed. It covers maintenance tasks and how often they’re done, examination and testing procedures, maintenance records, oil logs, optimal equipment settings and climate conditions for the machine room, drawing on the manufacturer’s recommendations.

Have other questions? Contact us

share this article

RELATED Posts

"*" indicates required fields

Let us help you with your
elevator needs

Share a few details and our team will get back to you with the right service plan and clear next steps. No pressure, just helpful guidance from experienced technicians.